After seven days allowing the concrete to cure, the steel arrived for erection.
The lower beams border the vaulted ceiling of the Great Room. The high beam is the ridge.
The wall framing arrives in prebuilt sections. It should take only two days to raise the walls.
On Wednesday the drilling crew arrived for the water well. By Thursday they had finished drilling – final depth 385′.
Friday the casing was inserted and cemented in and Monday the screen was installed.
Drilling part is done, now we just need plumbing and power. tgh